Commercial and office fit-out

Offices, showrooms, clinics and restaurants across Dubai. We take the space from landlord drawings to opening day, including the approvals that usually hold projects up.

AED 150 per sq ft
Starting rate
8 to 14 weeks on site
Typical timeline
Offices, retail, clinics, F&B
Suited to
DDA, Trakhees, DM, free zones
Approvals

The approvals we handle

This is where most Dubai fit-outs lose time. We submit while the design is being finalised, so the two run in parallel.

  • Landlord / building management

    Fit-out NOC, working hours and access

    3 to 7 days
  • Dubai Municipality

    Building modification and interior works permit

    7 to 14 days
  • DDA / Trakhees / free zone

    Design and drawing approval for the relevant jurisdiction

    10 to 21 days
  • Civil Defence

    Fire alarm, sprinkler and emergency lighting approval

    7 to 14 days
  • DEWA

    Power connection, load increase and metering

    7 to 20 days
  • DHA / Food Safety

    Clinic or food outlet specific approval, where applicable

    14 to 30 days

What this includes

Everything in this list is part of the scope and appears as its own line in your quotation.

  1. 01

    Landlord coordination

    Fit-out guidelines read, NOCs raised and building management kept in the loop.

  2. 02

    Authority approvals

    DDA, Trakhees, Dubai Municipality, Civil Defence and DEWA submissions.

  3. 03

    MEP works

    HVAC, electrical, plumbing and fire systems by licensed subcontractors under our supervision.

  4. 04

    Partitions and ceilings

    Glass, acoustic and drywall systems built to the approved drawings.

  5. 05

    Brand and signage

    Your identity applied consistently across the space, including signage approvals.

  6. 06

    Handover pack

    As-built drawings, warranties, certificates and a snag-free completion.

Project images

Work delivered by our own design and site teams across Dubai and the UAE.

Watch the work

Walkthroughs, site progress and client interviews.

  • Video coming soon

    Office fit-out time-lapse, Business Bay

  • Video coming soon

    Landlord approvals explained

  • Video coming soon

    Clinic fit-out to DHA standards

  • Video coming soon

    Restaurant fit-out, concept to opening

  • Video coming soon

    Night works in an occupied building

  • Video coming soon

    Client interview: DIFC office

Beyond the UAE

We also deliver outside the Emirates

Our design and site teams travel. Where a client is building outside the UAE, we mobilise the same team, the same drawings and the same standard of finish, and we handle shipping, customs and local coordination ourselves.

  • Shipping, customs clearance and on-site logistics handled by us
  • Joinery manufactured in our Dubai workshop and shipped complete
  • A mobilised project manager on site for the whole programme
  • Same drawings, same specification, same handover documents
  • Djibouti

    Hospitality and commercial interiors delivered with shipped joinery and a mobilised site team from Dubai.

    Watch the Djibouti project
  • United Arab Emirates

    Dubai, Abu Dhabi, Sharjah and the Northern Emirates, with our workshop and full site teams based in Dubai.

Three ways to start

Pick whichever suits you. All three reach the same team.

  • Most popular01

    Book a site visit

    We come to the property, measure it and give you a realistic range on the spot.

    Book a visit
  • 02

    Get an itemised quotation

    Send the basics and we come back with a line-by-line scope and price.

    Get an estimate
  • 03

    Download the portfolio

    Our completed work, materials and process in one PDF, if you are still comparing.

    Download brochure

Questions about this service

How long do landlord and authority approvals take?

Typically two to four weeks, depending on the building and the authority. We submit while the design is being finalised so the two run in parallel rather than one after the other.

Can you work outside business hours?

Yes. In occupied buildings and malls most works run at night or over weekends, and that is priced into the programme rather than added later.

Do you do clinics and food outlets?

Yes. Both carry extra authority requirements, DHA for clinics and Food Safety for F&B, and we build those approvals into the timeline from the start.